Holding tank vs mound

A holding tank has no drainfield. DSPS says it only holds wastewater until a liquid waste hauler pumps it, and that servicing is due when wastewater reaches a level one foot below the tank's inlet invert. A mound is a soil-absorption system built in fill above the original grade. It still has a septic tank in front of it, and that tank follows the one-third sludge-and-scum pumping rule.

Last checked Nov. 2026

Holding tanks

There is no soil absorption field. Wastewater stays in a watertight tank until it is pumped.

SPS 383.54 says servicing must occur at least when the wastewater reaches a level one foot below the inlet invert. DSPS says an alarm alerts the owner at that level.

A licensed septage business does the pumping, under NR 113 and NR 114.

Counties often charge a different sanitary permit fee for a holding tank than for a soil-based system. Examples from posted schedules checked in November 2026: Waukesha County $869, Dane County $509 (up to 2,000 gpd), Washington County $600 for a new or replacement tank under 3,000 gpd (including the $100 state fee), and Chippewa County $400.

Mound systems

Waukesha County lists mound systems among the types it permits, along with at-grade, non-pressurized in-ground, pressurized in-ground, and holding tanks.

A mound still has a treatment tank. That tank is pumped when sludge and scum reach one-third of tank volume, and the system is inspected on the county's maintenance schedule.

Vilas County requires inspections of both the plowed layer before construction and the mechanical components before covering on mounds, at-grade, and sand fill systems. Pressurized systems and mounds in Vilas County must go to DSPS for plan review.

Posted mound sanitary permit fees checked in November 2026 include Waukesha County $1,167 (less than 3,000 gpd), Dane County $1,283 (up to 2,000 gpd), Washington County $700 for pressurized systems including mounds (including the $100 state fee), and Chippewa County $500.

Which one a site can use

That depends on the soil and site evaluation and on the design a licensed professional submits with the sanitary permit. The county or DSPS reviews the plan. This page does not choose a system type for a lot.