Polk County septic systems
Polk County issued 354 sanitary permits in 2025, the fifth most in Wisconsin, according to the WCCADM POWTS Update. A 2023 county board resolution says the county has 17,155 known private sewage systems. County code requires each septic tank to be inspected and pumped at least once every three years unless it is less than one-third full of sludge and scum.
Last checked Nov. 2026
Polk County program
Polk County Environmental Services Division, Department of Land Information (Zoning)
Polk County Government Center, 100 Polk County Plaza, Suite 130, Balsam Lake, WI 54810
Phone: 715-485-9279
8:30 a.m. to 4:30 p.m. Monday through Friday
Maintenance rules
Polk County code Sec. 40-31 says every permitted septic tank must be visually inspected and pumped within three years of installation. After that it must be done at least once every three years.
Pumping can be skipped at that visit if the inspection finds sludge and scum take up less than one-third of the tank.
A plumber, a POWTS inspector or a licensed septage operator may do the visual inspection. Pumping must be done by a certified septage servicing operator under NR 113.
The inspection report must reach the county within 30 days of the inspection or pumping. Polk County takes these reports electronically through its Ascent permit system. Licensed pumpers call Polk County Zoning to get a user ID.
The county sends a first maintenance notice, then a reminder and a violation warning.
A holding tank owner must sign a maintenance agreement with the town, city or village. It is recorded with the register of deeds.
A violation can bring a forfeiture of $200 to $1,000 per offense. Each day counts as a separate offense.
How to get a sanitary permit
- A certified soil tester does a soil and site evaluation for systems that use the soil. The original signed report goes to the county zoning department.
- A Wisconsin licensed plumber designs the system and applies for the sanitary permit.
- The plumber gives the county 24 hours' notice for the final inspection.
Sanitary permit fees
Fees come from the Polk County Land Information Fee Schedule, effective January 1, 2026.
| Item | Fee |
|---|---|
| Conventional sanitary permit | $525 |
| In-ground pressure, mound or experimental (at-grade) system | $525 |
| Holding tank | $620 |
| County sanitary permit (reconnect, privy, composting, chemical) | $200 |
| Renewal, transfer or plan revision (each) | $80 |
| Sewer inspection | $250 |
Licensed pumpers and inspectors
Polk County does not post its own pumper roster. Its sanitary system page links to the state lists of licensed pumpers, plumbers and certified soil testers. Use the state lookups below.
Look up an active septage business in the DNR Environmental Licensing and Certification septage business lookup. Search by business name or license number.
Look up a certified soil tester, POWTS inspector, or POWTS maintainer in the DSPS credential search. Soil tester numbers use the suffix - ST. POWTS inspector numbers use - PI. POWTS maintainer numbers use - PO.
Sources
- Polk County Sanitary System page (Ascent reporting, contacts, office hours)
- Polk County Land Information Fee Schedule, effective January 1, 2026
- Polk County Resolution No. 09-23 amending the POWTS ordinance (Sec. 40-30 to 40-32, citations; 17,155 known systems)
- WCCADM POWTS Update, March 20, 2026 (2025 sanitary permits by county)